Gardner GMC dealership demolition

Client
Diverse Construction
Location
Abbotsford
Start Date

This demolition required some very precision work to avoid damaging the car dealership directly to the west of the  building being taken down. It was in a very high exposure area with lots of on lookers.  Roof over hangs where sitting at lot line and had to be cut by the specialized demo crew at Asara. Many by-standers watched as this task was completed hoping for a show, however the team completed the tasks exactly as planned, flawlessly. The back wall of the building also sitting on lot line was made of cinder blocks and one wrong move could cause substantial damage to the neighboring building. The excavator operator meticulously picked apart the wall piece by piece. End of the story is the walls and roof came down within property lines with zero damage to neighboring buildings or property.

Another project completed on time and on budget! 

If you look carefully at this picture you will notice how close the neighbouring building is.
Seperating wood from demo debris is key to keeping costs under control.
Scrap salvage was well worth the time it took to sort on this job.